Industry
Gallery
YEAR
2022/26
Case Study
Natural History Museum, London
Wildlife Photographer of the Year
A multi-year collaboration with the Natural History Museum, supporting one of the world's most recognised photography exhibitions. A relationship that began with bespoke frame design has grown year on year into full production responsibility for both the main exhibition and its international touring program.
Project Overview
Location: London (South Kensington & Tring) and international touring
Client: Natural History Museum
Scope: Frame design, print production, and colour management
Scale: 100+ lightbox displays and approximately 1,000 touring prints annually
Duration: Ongoing, five years and growing
The Brief
Museum-standard presentation of award-winning photography with absolute colour accuracy
Precise reproduction from photographer-supplied files across a wide range of styles and sources
A durable, reusable framing solution capable of annual refresh without loss of quality
Consistency maintained across the main exhibition and all touring formats simultaneously
Our Approach
Designed and developed a bespoke lightbox framing system allowing works to be replaced annually while maintaining structural integrity
Following successful delivery, scope expanded to include full print production
Controlled workflow established covering colour editing, test proofing, and final output
All works individually reviewed under lightbox conditions, replicating the final display environment before release
Production
Fine art prints produced across multiple formats, including large-scale works up to 1.5m x 1.5m
Colour managed across hundreds of images presented simultaneously, across diverse photographic styles and sources
Custom lightbox frames manufactured for durability and repeat use, enabling efficient annual refresh
Consistency maintained between main exhibition and touring counterparts throughout
Delivery & Outcome
Production scheduled in line with annual exhibition deadlines and international touring requirements
All works delivered installation-ready across multiple locations
Consistent, colour-accurate presentation achieved across five years and counting
Systems in place to support continued annual updates and international rollout
Five years. One standard. A partnership built on trust.












