Case Study
Hilton Park Lane, London
A full hotel refurbishment requiring the production and bespoke framing of over 900 artworks across 450 rooms, suites, corridors, and public areas. Delivered over a 36-week phased programme, with every element aligned to a custom furniture scheme demanding precise material and finish matching.
Project Overview
Location: Park Lane, London
Client: Hospitality
Scope: Print production, bespoke framing, large-format canvas, and mirrors
Scale: 900+ artworks across 450 rooms and public areas
Duration: 36 weeks
The Brief
Consistent artwork scheme across all rooms, suites, corridors, and public areas
Framed prints, large-format canvases, and bespoke elements combined within a single scheme
All framed works and mirrors required to align precisely with custom-designed furniture
Exact tone and finish matched across all materials throughout
Our Approach
Worked closely with the design team to develop a production and framing specification at scale
Timber mouldings carefully selected and graded prior to production
Custom stain mixes developed to match the exact tone and warmth of the surrounding furniture
Structured workflow implemented to manage volume without compromising finish or detail
Production
600+ bespoke frames produced with hand-stained finishes and anti-reflective art glass
300+ large-format canvases printed, mounted, and framed, with works reaching up to 2m x 1m
All canvases sealed with matte varnish for surface protection and reflection control
Framed originals and mirrors produced to match the wider scheme throughout
Delivery & Outcome
Delivered in phases over 36 weeks, aligned with installation schedules across the site
All works supplied installation-ready, ensuring efficient on-site execution
900+ artworks delivered consistently across all rooms and public spaces
Completed to schedule, to specification, without exception
Nine hundred works. Thirty-six weeks. Every finish matched to the last frame.