Industry
Hospitality
YEAR
2025
Case Study
Marriott Marbella Beach Resort, Spain
A large-scale resort project requiring the production and delivery of over 1,000 artworks across guest rooms and public areas, delivered through a coordinated UK and European production workflow.
Project Overview
Location: Marbella, Spain
Client: Hospitality
Scope: Fine art printing, mounting, and framing
Scale: 1,000+ artworks across multiple areas
Completed: 2025
The Brief
Consistent artwork scheme across a high-volume resort environment
Wide range of formats and finishes across guest rooms and public areas
Tight control over colour, materials, and production standards
Alignment with a phased installation schedule throughout
Our Approach
Production split across our London facility and European workshop in Portugal
Test prints and framing samples approved in the UK, with matched profiles replicated in Portugal
Colour standards calibrated across both sites to ensure identical output regardless of location
Dual-site workflow maintained speed and control without compromise to consistency
Production
Framed stretched canvases set within bespoke tray frames
Acrylic-mounted works specified for bathroom environments
Framed prints produced across guest room and public area formats
All elements produced to controlled colour workflows and matched specifications throughout
Delivery & Outcome
Works delivered in phases, aligned precisely with installation schedules
All deliveries carried out using our own vehicles, ensuring full control over timing and sequencing
Over 1,000 artworks delivered consistently across multiple formats and locations
Phased programme met in full, on time, without disruption
Over 1,000 artworks. Two countries. One standard.





