Hilton Park Lane

London, UK.

Hilton Park Lane

London, UK.

Industry

Hospitality

YEAR

2024

Case Study

Hilton Park Lane, London

A full hotel refurbishment requiring the production and bespoke framing of over 900 artworks across 450 rooms, suites, corridors, and public areas. Delivered over a 36-week phased program, with every element aligned to a custom furniture scheme demanding precise material and finish matching.

Project Overview

  • Location: Park Lane, London

  • Client: Hospitality

  • Scope: Print production, bespoke framing, large-format canvas, and mirrors

  • Scale: 900+ artworks across 450 rooms and public areas

  • Duration: 36 weeks

The Brief

  • Consistent artwork scheme across all rooms, suites, corridors, and public areas

  • Framed prints, large-format canvases, and bespoke elements combined within a single scheme

  • All framed works and mirrors required to align precisely with custom-designed furniture

  • Exact tone and finish matched across all materials throughout

Our Approach

  • Worked closely with the design team to develop a production and framing specification at scale

  • Timber mouldings carefully selected and graded prior to production

  • Custom stain mixes developed to match the exact tone and warmth of the surrounding furniture

  • Structured workflow implemented to manage volume without compromising finish or detail

Production

  • 600+ bespoke frames produced with hand-stained finishes and anti-reflective art glass

  • 300+ large-format canvases printed, mounted, and framed, with works reaching up to 2m x 1m

  • All canvases sealed with matte varnish for surface protection and reflection control

  • Framed originals and mirrors produced to match the wider scheme throughout

Delivery & Outcome

  • Delivered in phases over 36 weeks, aligned with installation schedules across the site

  • All works supplied installation-ready, ensuring efficient on-site execution

  • 900+ artworks delivered consistently across all rooms and public spaces

  • Completed to schedule, to specification, without exception

Nine hundred works. Thirty-six weeks. Every finish matched to the last frame.

More Projects

Start your next project?

Start your next project?

Start your next project?